DESCRIPTION | Value of Work (Rs. Inlakhs) | TYPE OF WORK BEING PERFORMED |
---|---|---|
Constrcution of Flyover and Rail Over Bridge(ROB) including modifications to GIDA Bridge No.2 at Vallarpadam. (Cochin Port Trust) |
5997.00 | Flyover |
Doubling of track between Haripad & Ambalapuzha -Proposed construction of major brigde No.EAK 213 & minor bridges with deep foundation for Br.No.204, 205 & 214 opposite to the existing bridges between Ambalapuzha & Haripad stations. (Southern Railway) |
1527.00 | Bridge |
Piling works for Construction of 1x 660 MW Supercritical Ennore Thermal Power Station Expansion Project. (Lanco Infratech Limited) |
2348.70 | Piling Work |
Doubling of track between Haripad & Ambalapuzha - Proposed construction of major bridge Nos.EAK 200, 188 and minor bridge with deep foundation for bridge No.185 opposite to the existing brigdes between Ambalapuzha & Haripad stations. (Southern Railway) |
970.00 | Bridges |
Construction Of Multi-user Liquid Terminal at Puthuvypeen,Kochin Port. (RKEC Projects Pvt Ltd) |
1879.00 | Port Work |
Construction of pile work including construction of Temporary Approach Road at Creek Area along the External Coal handling Plant (ECHP) Corridor at Ennore,Chennai. (Lanco Infratech Limited) |
1460.00 | Piling Work |