Ongoing Projects

DESCRIPTION Value of Work (Rs. Inlakhs) TYPE OF WORK BEING PERFORMED
Constrcution of Flyover and Rail Over Bridge(ROB) including modifications to GIDA Bridge No.2 at Vallarpadam.
(Cochin Port Trust)
5997.00 Flyover
Doubling of track between Haripad & Ambalapuzha -Proposed construction of major brigde No.EAK 213 & minor bridges with deep foundation for Br.No.204, 205 & 214 opposite to the existing bridges between Ambalapuzha & Haripad stations.
(Southern Railway)
1527.00 Bridge
Piling works for Construction of 1x 660 MW Supercritical Ennore Thermal Power Station Expansion Project.
(Lanco Infratech Limited)
2348.70 Piling Work
Doubling of track between Haripad & Ambalapuzha - Proposed construction of major bridge Nos.EAK 200, 188 and minor bridge with deep foundation for bridge No.185 opposite to the existing brigdes between Ambalapuzha & Haripad stations.
(Southern Railway)
970.00 Bridges
Construction Of Multi-user Liquid Terminal at Puthuvypeen,Kochin Port.
(RKEC Projects Pvt Ltd)
1879.00 Port Work
Construction of pile work including construction of Temporary Approach Road at Creek Area along the External Coal handling Plant (ECHP) Corridor at Ennore,Chennai.
(Lanco Infratech Limited)
1460.00 Piling Work